Jiangsu Jiyuan Medical Technology Co., Ltd. has entrusted Jiangsu Xinruijie Environmental Protection Technology Co., Ltd. to prepare an environmental impact assessment report for the project. In order to listen to the opinions and requirements of enterprises, institutions, and individuals in the project area regarding the environmental protection of the construction project, the environmental impact assessment report for the construction project of Jiangsu Jiyuan Medical Technology Co., Ltd. is now made public.




1、 Project Overview




(1) Project Name: Medical Disposable Electronic Endoscope and Medical Endoscope Image Processor (Reapproved)




(2) Project location: Buildings 46, 47, and 48, No. 59 Meilan East Road, Hailing District, Taizhou City




(3) Construction content: The enterprise originally planned to invest 56.8 million yuan to lease a factory located in Building 48, Meilan East Road, Hailing District, Taizhou City, with a leased area of 1317.92 square meters; Purchase 43 sets of main and auxiliary equipment such as ultrasonic cleaning machines, air drying ovens, and assembly lines, and construct a medical disposable electronic endoscope and image processing system project; In July 2021, the company commissioned an environmental impact assessment unit to prepare the Environmental Impact Assessment Report for the Medical Disposable Electronic Endoscope and Image Processing System Project, and obtained approval from the Taizhou Administrative Approval Bureau on October 18, 2021 (Taixing Approval (Hailing [2021] No. 20077);


At present, the project is under construction. Based on the actual construction situation on site, the construction unit has made adjustments to production capacity, production technology, and layout. The adjusted content has certain differences from the original environmental impact assessment and approval. According to the Notice on Issuing the List of Major Changes for Pollution Impact Construction Projects (Trial) (Environmental Impact Assessment Letter [2020] No. 688), it is a major change and should be re approved for the environmental impact assessment document of the construction project. The project has been filed with the Hailing District Administrative Approval Bureau of Taizhou City on April 8, 2022 (filing number: Taihai Xingshen Bei [2022] No. 75).




2、 Main matters for soliciting public participation




Solicit opinions from all the public who may be affected by this project on the construction of this project, opinions and suggestions on pollutant generation and environmental protection measures, opinions and suggestions on environmental protection during the operation of the construction project, and other relevant requirements and suggestions.




3、 The main ways for the public to express their opinions




Within 5 working days of the announcement, the public may express their opinions and views on the construction and environmental impact assessment work by sending letters, phone calls, emails, and other means to the designated address in the announcement.




4、 Contact Information




Contact address: Building 46, 47, 48, No. 59 Meilan East Road, Hailing District, Taizhou City




Contact: Yang Yang




Contact phone number: 17798890171




Environmental Impact Assessment Unit: Jiangsu Xinrui Jingjie Environmental Protection Technology Co., Ltd